1.latest design with Pivotal Blow Structure. Compared with models with similar capacity, Pivotal Blow Structure allows simple & smaller cylinders applying, faster operation and save 50-70% energy consumption for Clamping Process.
2.Pivotal Blow Structure & Aluminium Blow Molds makes blowing operation faster, which is 2300BPH per hour with 2 cavity molds.
3.Special design heating element save 50% power & space.
4.Each heating lamp is controlled by independent controller.
5.Running energy consumption cost only 4.8KW for blowing 600ml at speed of 1800bph.
6.20 sets of operation data could be stored in system.
7.Product pass rate is over 99.9%.
8.Simple structure, easy maintenance